The Pearl Hotel Renovation
Hollow Bar Micropile Installations and Testing
Kelikai installed approximately 52 hollow bar type micropiles, to a depth of approximately 65’ deep, right in the heart of Waikiki. The design specifications required a sacrificial pre-production compression test, along with the proof (tension) testing of 10% of all the production piles.